ABB INSEM01序列主模块
ABB INSEM01序列主模块中文资料:
ABB INSEM01序列主模块有关更多详细信息,请参阅本章前面的部分。已尝试将步骤按顺序排列,以使流程尽可能高效。然而,由于系统设计的差异很大,此顺序可能不是您的系统最有效的,因此您可能希望修改此过程以满足您的需要。ABB INSEM011.收集工作的原理图、布局、印刷品和其他信息。警告为避免人员触电或PLC损坏,我们建议您在安装和接线PLC之前关闭系统的所有电源。此外,在钻孔和攻丝时,将所有电子部件远离该区域,以防止金属屑和锉屑进入这些敏感部件。2.根据布局图,确定基板的安装位置。使用布局图上给出的尺寸或本手册“基板”章节中的尺寸布置孔位置。3.标记底板安全接地线的孔位置(参见本章“底板安全接地”)。ABB INSEM01
英文资料
Some steps refer to earlier sections of this chapter for additional details. An attempt was made to place the steps in an order that will make the process as efficient as possible. However, due to the wide variance in system designs, this order may not be the most efficient for your system, so you may wish modify this procedure to fit your needs. 1. Gather the schematics, layouts, prints, and other information for the job. Warning To avoid the possibility of electrical shock to personnel or damage to your PLC, we recommend that you shut off all power to the system before mounting and wiring the PLC. Also, keep all electronic components away from the area while drilling and tapping to keep metal chips and filings out of these sensitive components. 2. From the layout drawing, determine where the baseplate(s) will be mounted. Lay out the hole locations, either using the dimensions given on your layout drawing or from the “Baseplates” chapter of this manual. 3. Mark the hole locations for the baseplate safety ground wire (see “Baseplate Safety Ground” in this chapter).ABB INSEM01
每 日 展 示
公 司 主 营 优 势
应 用 行 业