ABB INNPM11网络处理模块
ABB INNPM11网络处理模块中文资料:
ABB INNPM11网络处理模块必须按照下一页的特殊安装说明安装此系统。配电线路的一条腿连接到保护接地或配电线路的两条腿之间的抽头连接到保护地的系统不是浮式中性系统。非浮动中性点系统的示例使用这些浮动中性点的特殊安装说明1。输入电源端子应按照本章“交流电源连接”部分的说明进行接线。2.如果使用具有此功能的电源,则必须拆除电源模块端子3和4之间出厂安装的跳线。有关详细信息,请参阅“电源”一章的“过电压保护装置”一节。ABB INNPM113.电压浪涌保护装置,如MOV,必须安装在以下端子之间:从L1到接地Ŷ从L2(中性点)到接地电压浪涌装置的额定值必须确保系统免受超过线路电压+100V+(N-PE)MAX的电力线瞬变的影响ABB INNPM11
英文资料
This system must be installed using the special installation instructions on the following page. Systems in which one leg of the power distribution wiring is tied to Protective Earth or a tap between two legs of the power distribution wiring is tied to Protective Earth are not Floating Neutral Systems. Examples of Non-Floating Neutral System Use These Special Installation Instructions for Floating Neutral Systems 1. The input power terminals should be wired according to the instructions in the “AC Power Source Connections” section of this chapter. 2. The factory installed jumper between terminals 3 and 4 of the Power Supply module must be removed if using one of the Power Supplies that have this feature. See the “Overvoltage Protection Devices” section of the “Power Supplies” chapter for details. 3. Voltage surge protection devices, such as MOVs, MUST be installed between the following terminals: Ŷ From L1 to earth ground Ŷ From L2 (Neutral) to earth ground The voltage surge devices must be rated such that the system is protected from power line transients that exceed Line voltage + 100V +(N-PE)MAXABB INNPM11
每 日 展 示
公 司 主 营 优 势
应 用 行 业