PPD113 B03-26-100110 3BHE023584R2634工控备件机器人模块
详见第6节。确定接线方法,并确定控制单元接线垫的输入和输出连接点。5.10最终细节准备安装布局和电路的工作计划和图纸。建议将所有测量和计算记录并保存在机器的技术文件中。25第6节-安装和调试开始安装前,应完整阅读本手册。开始工作前,请仔细学习本节内容。安装和调试应由系统设计师监督。需要一名熟悉工业布线实践的机械技术人员和一名电工进行安装。调试应由在安全安装方面有经验的训练有素的电气技术人员进行。需要以下专用工具:预绝缘对接接头的压接工具图21连接器(如Raychem AD-1522-T)图22热收缩用带反射器附件的热风枪(如Rayhem HL1802E)6.1 MAT INSTALLATION隔离并锁定机器电源。检查地板是否平整、光滑、干净、无碎屑,以及任何埋地管道或其他布线是否正确到位。拆开垫子,小心保持平整,不要拉扯电线。
See section 6 for further details. Determine the wiring method and determine the input and output connection points for the mat to control unit wiring. 5.10 FINAL DETAILS Prepare a work schedule and drawings of the installation layout and the electrical circuit. It is recommended that all measurements and calculations are recorded and retained in the technical file for the machine. 25 Section 6 - INSTALLATION AND COMMISSIONING This manual should be read in full before commencing installation. Study this section completely before starting work. The installation and commissioning should be supervised by the system designer. A mechanical technician and an electrician familiar with industrial wiring practices will be required to undertake the installation. Commissioning should be undertaken by a trained electrical technician experienced in safety installations. The following special tools are required: Crimp tool for pre-insulated butt splice Fig. 21 connectors (e.g. Raychem AD-1522-T) Fig. 22 Hot air gun with reflector attachment for heat shrinking (e.g. Raychem HL1802E) 6.1 MAT INSTALLATION Isolate and lock off the machine power supply at source. Check that the floor is flat, smooth, clean and free of debris and that any buried conduit or other wiring provision is correctly in place. Unpack the mats being careful to keep them flat and not to pull on the wires.