您的浏览器版本过低,为保证更佳的浏览体验,请点击更新高版本浏览器

以后再说X

欢迎访问瑞昌明盛自动化设备有限公司网站!

图片名

全国订购热线:
+86 15270269218E-mail:stodcdcs@gmail.com

ABB >>

A-B>>

GE>>

BENTLY>>

6240BP10431A PLC/可编程控制系统

6240BP10431A PLC/可编程控制系统

6240BP10431A PLC/可编程控制系统高压模块的绝缘条安装主题描述90-70系列模块兼容性有关RX7i CPU支持的模块列表,请参阅PACSystems RX7i安装手册,GFK-2223。高压模块的绝缘条安装在带有金属面板的模块右侧的高压模块上需要绝缘条。绝缘条应安装在以下版本早于以下版本的模块上:IC697MDL240D IC697LDL640E IC697MTL241D IC697...

  • 功能特性
  • 参数规格
  • 视频
  • 应用案例
  • 下载

6240BP10431A PLC/可编程控制系统


    6240BP10431A PLC/可编程控制系统

    高压模块的绝缘条安装

    主题描述90-70系列模块兼容性有关RX7i CPU支持的模块列表,请参阅PACSystems RX7i安装手册,GFK-2223。高压模块的绝缘条安装在带有金属面板的模块右侧的高压模块上需要绝缘条。绝缘条应安装在以下版本早于以下版本的模块上:IC697MDL240D IC697LDL640E IC697MTL241D IC697 MDL340G IC697DTL250G IC699MDL341E IC697 MTL251E IC697-MDL350F注意:这些模块的当前版本随绝缘子一起装运。该条在印刷线路组件的背面可见。RX7i机架附带一个绝缘体套件,该套件包含足够的部件,可更新三个90-70系列I/O模块、一个BEM713(总线变送器)模块和一个BEM 731(Genius总线控制器)模块。在一次扫描中多次调用SVC_REQ 57可能导致CPU看门狗超时多次调用SVC _REQ(逻辑驱动写入非易失性存储器)可能导致CPU触发看门狗定时器并进入STOP-HALT模式。可以调用SVC_REQ 57的次数需要考虑许多变量:软件监视器超时值是多少、写入的数据量、扫描时间是多长、非易失性存储器(闪存)的使用寿命等。GE Intelligent Platforms建议将每次扫描对SVC_REQ 57的调用次数限制为一次,以避免出现停止停止的可能性。不总是提供SNP ID与90系列不同,PACSystems CPU的SNP ID不会出现在Machine Edition编程器显示状态显示中。当没有SNP ID存储到CPU时,服务请求11将始终返回零

    主题说明电池安装

    CPU限制和开放问题主题说明电池安装安装内存备用电池时必须遵循特定说明。有关更多信息,请参阅PACSystems Controller Battery and Energy Pack Manual,GFK-2741。CPU可能无法检测到电池电量不足的情况,除非使用智能电池,否则PACSysts CPU可能无法及早检测到电池不足的情况以提供更换电池的有意义的警告。具有非常低容量的传统电池可能仍具有足够高的端子电压,以报告其为良好电池。在这种情况下,当电池开始提供存储器电源(备用电池)时,电池电压将迅速下降到不可接受的水平,在故障发生前几乎不会向用户发出警告。为确保在使用除智能电池以外的任何类型的电池时不会丢失数据,用户应根据PACSystems控制器电池和能量包手册GFK-2741中提供的指南更换电池。此外,用户可以将逻辑和硬件配置保存到闪存中。逐字更改期间的以太网断开如果在逐字更改过程中以太网连接断开,程序员可能不会在重新连接后允许后续逐字更改,因为它认为当前连接了另一个程序员。如果发生这种情况,您应该脱机,然后重新联机。不支持作为VME主机运行的VME模块RX7i不支持作为总线主机运行的VM模块。使用多个GBC存储硬件配置存储两次包含两个或多个90-70系列GBC的硬件配置可能会导致一个GBC配置失败。清除存储之间的硬件配置将防止产生此故障。(注意:此问题不影响90-30系列GBC。)不支持同时清除、加载和存储。目前,RX7i不支持多个编程器同时更改CPU内容。编程软件可能在操作期间产生错误。

    Installation of insulating strip of high-voltage module

    Topic Description 90-70 Series Module Compatibility For the list of modules supported by the RX7i CPU, see the PACSystems RX7i Installation Manual, GFK-2223. The insulating strip of the high-voltage module is required to be installed on the high-voltage module on the right side of the module with the metal panel. Insulating strips shall be installed on modules with versions earlier than IC697MDL240D IC697LDL640E IC697MTL241D IC697 MDL340G IC697DTL250G IC699MDL341E IC697 MTL251E IC697-MDL350F Note: The current versions of these modules are shipped with insulators. This bar is visible on the back of the printed wiring assembly. The RX7i rack comes with an insulator kit that contains enough parts to update three Series 90-70 I/O modules, one BEM713 (bus transmitter) module, and one BEM 731 (Genius bus controller) module. Call SVC multiple times in one scan_ REQ 57 The CPU watchdog may timeout and call SVC many times_ REQ (logic drive writing nonvolatile memory) may cause the CPU to trigger the watchdog timer and enter STOP-HALT mode. SVC can be called_ The number of times of REQ 57 needs to consider many variables: the timeout value of the software monitor, the amount of data written, the scanning time, the service life of non-volatile memory (flash memory), etc. GE Intelligent Platforms recommends that SVC_ The number of calls to REQ 57 is limited to one time to avoid the possibility of stopping. The SNP ID is not always provided, which is different from the 90 series. The SNP ID of PACSystems CPU will not appear in the machine edition programmer display status display. When no SNP ID is stored in the CPU, Service Request 11 will always return zero

    Topic Description Battery Installation

    The CPU Limitations and Open Issues topic describes the battery installationSpecific instructions must be followed when installing the memory backup battery. For more information, see PACSystems Controller Battery and Energy Pack Manual, GFK-2741. The CPU may not be able to detect the low battery condition. Unless a smart battery is used, the PACSysts CPU may not be able to detect the low battery condition early to provide a meaningful warning for battery replacement. A conventional battery with a very low capacity may still have a sufficiently high terminal voltage to report it as a good battery. In this case, when the battery starts to provide storage power (backup battery), the battery voltage will rapidly drop to an unacceptable level, and the user will hardly be warned before the failure occurs. To ensure that data will not be lost when using any type of battery other than smart batteries, users should replace the batteries according to the guidelines provided in the PACSystems Controller Battery and Energy Pack Manual GFK-2741. In addition, users can save logical and hardware configurations to flash memory. Ethernet disconnection during verbatim change If the Ethernet connection is disconnected during verbatim change, the programmer may not allow subsequent verbatim change after reconnection, because it considers that another programmer is currently connected. If this happens, you should go offline and then go back online. VME modules that do not support running as VME hosts RX7i does not support VM modules that run as bus hosts. Using multiple GBC storage hardware configurations to store hardware configurations containing two or more Series 90-70 GBCs twice may cause one GBC configuration to fail. Clearing the hardware configuration between stores will prevent this failure. (Note: This problem does not affect the 90-30 series GBC.) Simultaneous purging, loading, and storing are not supported. At present, RX7i does not support multiple programmers to change CPU content at the same time. The programming software may generate errors during operation.

    7170fa44a544deb89b8491ba6ba659f7.jpg

    微信图片_20211117105440.png

    16.jpg



    品牌:ABB

    型号:6240BP10431A  

    产地:瑞士

    质保:365天

    成色:全新/二手

    发货方式:快递发货


图片名 客服

在线客服 客服一号